MASSACHUSETTS: Turbine Installed on Martha’s Vineyard
Great Rock Windpower installed and commissioned the first Endurance model S-343 on Martha’s Vineyard this August. This turbine is designed to capture more energy and produce more power at lower wind speeds than previous models. A beta version has shown promising results so far — an average 57% increase in energy output during 3 very…
Great Rock Windpower installed and commissioned the first Endurance model S-343 on Martha’s Vineyard this August. This turbine is designed to capture more energy and produce more power at lower wind speeds than previous models. A beta version has shown promising results so far — an average 57% increase in energy output during 3 very low wind summer months.
Source: Great Rock Windpower