Encouraging Interconnection Rules in the Age of Distributed Energy
Interconnection procedures are the rules of the road for the grid. Without common rules and predictable processes, gridlock and costly projects can result. In IREC’s recently released 2019 Model Interconnection Procedures, we take the first steps toward defining a clear interconnection process for energy storage systems to provide a useful starting point for states navigating these issues.
As originally appeared in Energy Storage News
by Sara Baldwin
November 18, 2019
Interconnection procedures are the rules of the road for the grid. Without common rules and predictable processes, gridlock and costly projects can result. Alternatively, the adoption of statewide interconnection standards (i.e., rules that apply to all regulated utilities) that reflect well-vetted best practices can provide greater consistency across utilities and help streamline the grid connection process for all involved stakeholders. Interconnection rules are designed to handle current and anticipated growth of DERs, while also enabling more cost-effective and efficient clean energy projects.
In particular, interconnection standards can help states address the integration of newer technologies that are transforming the energy system, i.e., energy storage, solar-plus-storage, and smart inverters. Energy storage in particular requires more explicit provisions to address its unique flexibility and ability to operate differently based on different applications.
In IREC’s recently released 2019 Model Interconnection Procedures, we take the first steps toward defining a clear interconnection process for energy storage systems to provide a useful starting point for states navigating these issues. By addressing the unique qualities of energy storage, the 2019 procedures create an initial framework for reviewing energy storage and verifying energy storage system capabilities.
Read the full article.