New Research Shows That a Costly Utility Practice Is an Unnecessary Barrier to Clean Energy Development
Electric utilities, and the regulators who govern them, have the important responsibility of ensuring the safety and reliability of the electric grid. So, when a distributed energy resource—like a solar or energy storage project—seeks to connect to the grid, one of their primary considerations is ensuring the system will not compromise either of those things.
This is critically important.
It’s also important, however, to ensure that the requirements utilities impose to ensure grid safety and reliability make sense from a technical standpoint. On occasion, utilities may impose requirements that create undue burdens on customers that are not proportional to the risks the requirement seeks to address. These concerns have been raised in recent years about a grid protection method called direct transfer trip (DTT).
DTT’s exorbitant cost can derail the financial viability of clean energy projects, and in some cases entire clean energy programs. As such, it is important to understand if it is truly necessary or if there are other approaches that could effectively prevent the same safety and reliability risks. New research from the Interstate Renewable Energy Council (IREC) sheds light on the validity of utility DTT requirements for inverter DERs1—helping regulators and utilities make more informed decisions.
In this blog post, we detail the findings of IREC’s report, “Deconstructing Direct Transfer Trip: A Comprehensive Assessment of DER Islanding Risks, Safety Concerns, and Mitigations.” Read on to learn more about what this research means and how it can be used to improve grid protection strategies in your state or region and ensure that clean energy markets can still grow while maintaining grid safety and reliability.
What Is Direct Transfer Trip?
DTT is one of several ways of preventing an unintentional island (UI), an event that can threaten grid safety and reliability. UIs occur when one or more DERs continue to send electricity to a segment of the electric grid after being disconnected from the rest of the grid. DTT uses a direct, point-to-point communications link between geographically separated equipment to quickly disconnect and stop DERs from generating after they have been electrically isolated from the main utility grid, thus preventing a UI.
DTT has been increasingly required by utilities in recent years, but its use is heavily disputed. A key reason that DTT is contentious is that it is significantly more expensive than other UI mitigation strategies. For one form of DTT (fiber optic), costs range from $300,000–$410,000 for substation equipment, plus $150,000–$250,000 per mile of cable… per project!
DTT costs can be so significant that they threaten the financial viability of both individual DER projects and entire clean energy programs. For example, Fairfax County, Virginia’s clean energy plan to install solar panels on more than 100 buildings including schools, community centers, and government buildings was significantly disrupted when Dominion Energy began to require DTT for midsize solar projects exceeding 250 kilowatts, as the Washington Post reported in May 2024.
To date, there has been no independent full technical analysis of the need for DTT, making it challenging for stakeholders to challenge assertions by utilities that DTT is needed. IREC’s research presents critical evidence to inform more modern, risk-informed approaches to mitigate unintentional islanding risks.
This research is the first of its kind to assess the likelihood of UI risks that DTT is used to mitigate, examine the range of ways different utilities currently address UI risk, and draw conclusions about whether DTT is necessary for inverter DERs—or whether there are other, better alternatives.
Deconstructing Direct Transfer Trip: IREC’s Findings
IREC embarked on the research presented in this paper to vet the defensibility of current utility justifications for requiring DTT and provide evidence to support regulators, utilities, and other stakeholders in navigating decisions about what is required when DERs connect to the grid.
Our research covered several key topics: the probability of UIs occurring under different circumstances; the current range of utility methods to assess the risk of unintentional islands and determine whether mitigations are required to prevent them; and the available options for mitigating risks associated with a UI if one were to occur.
Probability
An important consideration in assessing whether it is appropriate to require DTT is the probability of an unintentional island, the event DTT is designed to prevent. As the paper details, three conditions must simultaneously occur for an unintentional island to be created and persist for more than a brief instant (i.e., a “persistent” unintentional island).2 These are:
- A subset of the power grid containing a DER and some amount of customer load must be isolated from the rest of the electric distribution grid (e.g., the opening of a circuit breaker).
- There must be balance between the power that the DER(s) is generating and the amount of load (i.e., power being drawn from the grid).
- There must not be any disruption of the island such as the activation of grid protection equipment or an inverter’s islanding detection algorithm.
Our researchers analyzed the likelihood of all of these conditions occurring simultaneously, resulting in a persistent unintentional island. We find that—even under worst-case conditions and the complete failure of inverter functions designed to prevent islands—the “probability of a persistent UI is extremely low—estimated between once every 3,800 to 10,000 years per circuit.”
In fact, as our paper explains, there has only ever been one documented instance of a persistent UI! This instance, which took place in the remote mining town of Ramore in Ontario, Canada, occurred under highly unusual transmission-level conditions and would not have been addressed by typical DTT mitigation approaches.
Furthermore, the one plausible cause of a persistent UI—non-fault-switching events, in which the utility intentionally disconnects a circuit from the rest of the grid—would in many cases not trigger DTT, making this an insufficient justification for requiring DTT. To prevent this cause of UI, “good utility practice should be employed to ensure de-energization, rather than employing hardware mitigation.” It was this cause, a switching error, that caused the persistent UI in Ramore.
Screening Approaches
Our report also reviews and documents the range of practices used by utilities today to mitigate the risk of islanding. We find that these run the gamut from “from very conservative to progressive” with some utilities not even assessing the risk of islanding for inverter DERs, and instead relying on the islanding detection algorithms of inverters to mitigate potential islanding.
It is also notable that the dominant practices that utilities use for screening islanding risks fail to focus on the main driver of island preconditions. “…[A]ll rely heavily on active power match thresholds, while ignoring the reactive power match component that has been shown to be the most relevant factor in determining the potential for an island. Therefore, the practices still tend to be conservative while missing the main driver of island preconditions.”
Finally, we find that “alternative approaches [to DTT], including refined screening and application of other protective techniques, have developed over time.” Based on increased research and experience, many utilities have moved towards narrower applications of DTT or lower-cost mitigation methods. Additionally, some utilities allow the option of a “risk of islanding study” before requiring DTT—an approach that IREC recommends.
Conclusions
Ultimately, “Deconstructing Direct Transfer Trip” finds that DTT is an unnecessary mitigation measure for inverter DERs in any case in which unintentional islanding could happen. There are some specific, non-inverter DER instances where its use is justified.
This finding is important for utility regulators, who have a critical role in ensuring that utility practices are based on the latest evidence and aligned with the actual risk levels. IREC recommends that utility regulators disallow requirements for DTT for inverter DERs on the electric distribution grid.
If DTT requirements are posing challenges in your jurisdiction, let us know! IREC is engaged in utility regulatory proceedings in many states and may be able to provide guidance or support. Fill out this form to share details about DTT in your area and someone will be in touch.
Footnotes
- As distinguished from rotating generator DERs which generate power using an electric turbine. An overview of the differences can be found in this article from the U.S. Energy Information Administration.
- A persistent unintentional is one that exceeds two seconds, a limit established for DERs within IEEE 1547-2018. (The Institute of Electrical and Electronics Engineers, IEEE Std 1547™-2018: IEEE Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (2018), doi: 10.1109/IEEESTD.2018.8332112.)