LicensingAll aspects of a PV installation are considered electrical work and must be done by a properly permitted and licensed electrician.  Mass building code and states that any electrical generating equipment and ancillary equipment must be installed by a licensed electrician. A Construction supervisor’s license (either an unrestricted CSL or a restricted one and two family CSL)…

Licensing
All aspects of a PV installation are considered electrical work and must be done by a properly permitted and licensed electrician.  Mass building code and states that any electrical generating equipment and ancillary equipment must be installed by a licensed electrician.

A Construction supervisor’s license (either an unrestricted CSL or a restricted one and two family CSL) is required when solar thermal work is involved and the building is a one or two family, stand-alone dwelling or is a small commercial building (less than 35,000 feet of aggregate volume (LxWxH)

Building permits are required any time solar thermal or solar PV is placed on a roof or ground rack due to new roof loads and/or wind issues. Interconnection with the electrical service requires the services of a licensed electrician and an electrical permit is required.

Resources

  1. Massachusetts Clean Energy Center
  2. Commonwealth of Massachusetts
  3. Office of Public Safety and Inspections
  4. Division of Professional Licensure, Board of State Examiners of Electricians